Departments » Public Works » Engineering Division » Capital Improvement Program (CIP) Project Updates
Reduce pollutants that enter Santa Monica Bay
Replace lift station with gravity line
Upgrade lift station, upsize wet well, and install second force main
Replace pipes with deficient fire flow capacity
Install infiltration system to improve water quality
Install new pump to handle peak domestic service
Improve sewer infrastructure
Improve long-standing water quality issues and fire flow capacity in the El Porto Area
Alleviate flooding issues for residents of Peck Ave and Marine Ave
Reconstruct lift station, upsize wet well, and install a second force main
The Sewer Master Plan (SMP) will include proposed improvements designed to correct pipe deficiencies, such as capacity issues, cracks and root intrusion.
Replace existing reservoir as it has exceeded its useful life
Install equipment to streamline water and wastewater billing processes